WIPP NQA-1 Procurement Oct 21

WIPP NQA-1 Procurement

Portfolio WIPP NQA-1 ProcurementCarlsbad, NMProject ObjectiveThe Waste Isolation Pilot Plant (WIPP) was designed to permanently dispose of transuranic radioactive waste left over from the research and production of nuclear weapons. Encorus was contracted to procure... Read more
WIPP PVS Fire Protection Design Oct 21

WIPP PVS Fire Protection Design

Portfolio WIPP PVS Fire Protection DesignCarlsbad, NMProject ObjectiveThe scope of this project was to design a fire loop around and connections to the proposed WIPP Permanent Ventilation System building.Unique Project FeaturesThis project involved multi-discipline... Read more
WIPP Safety Significant Instrument System Oct 21

WIPP Safety Significant Instrument System

Portfolio WIPP Safety Significant Instrument SystemCarlsbad, NMProject ObjectiveThe Waste Isolation Pilot Plant (WIPP) was designed to permanently dispose of transuranic radioactive waste left over from the research and production of nuclear weapons. The client... Read more
WIPP Supplemental Ventilation System Oct 20

WIPP Supplemental Ventilation System

Portfolio WIPP Supplemental Ventilation System Carlsbad, NM Project Objective The Waste Isolation Pilot Plant (WIPP) was designed to permanently dispose of transuranic radioactive waste left over from the research and production of nuclear weapons. The client... Read more

Brian Tomczyk

Back to Leadership Follow BRIAN TOMCZYK Director of Corporate Operations 716.592.3980 ext 132 Mr. Tomczyk has been an integral part of the Encorus Group’s growth since he joined the firm in 1999. Brian is a graduate of the University at Buffalo with a degree in... Read more