Buffalo VA Medical Center Boiler Control Assessment Dec 12

Buffalo VA Medical Center Boiler Control Assessment

Portfolio Buffalo VA Medical Center Boiler Control AssessmentBuffalo, NYProject ObjectiveThe client requested a review of the boiler control panels associated with the boilers located at the Buffalo VAMC. The control panels had been installed approximately three years... Read more
Buffalo VA Medical Center Building 1 Cooler Design Dec 11

Buffalo VA Medical Center Building 1 Cooler Design

Portfolio Buffalo VA Medical Center Building 1 Cooler DesignBuffalo, NYProject ObjectiveThe objective of this project was to renovate approximately 1,858 square feet of dietary coolers and freezers in Building 1 to bring them up to modern standards for insulation,... Read more
Buffalo VAMC Buildings 11 & 18 Switchgear Replacement Dec 9

Buffalo VAMC Buildings 11 & 18 Switchgear Replacement

Portfolio Buffalo VAMC Buildings 11 & 18 Switchgear ReplacementBuffalo, NYProject ObjectiveThis project encompassed design services to replace the existing transformers and switchgear located in Buildings B11 and B18 at the Buffalo VAMC. This system distributes... Read more