Encorus Group Staff Spotlight: Brian Kader Jan 5

Encorus Group Staff Spotlight: Brian Kader

Brian Kader graduated from Boston University with a Bachelor’s Degree in broadcast journalism, and a concentration in psychology. He never had any intentions of entering the engineering field but the opportunity to work flexible hours at Encorus enabled him to do so.... Read more
Buffalo VAMC Walk-In Cooler Design Dec 15

Buffalo VAMC Walk-In Cooler Design

The Buffalo VA Medical Center was constructed in the late 1940s.  Some of the facility’s dietary refrigeration equipment had been renovated in 1990; some systems had remained largely unchanged since their installation in 1949.  Encorus Group, along with kitchen design... Read more
Magnetic Particle Non-Destructive Testing Nov 24

Magnetic Particle Non-Destructive Testing

Magnetic Particle NDT is a process included in the range of nondestructive testing services that Encorus offers. This method is commonly used to test ferrous metal objects for “surface or near surface” defects due to the relatively quick and straight forward... Read more
ECHDC Outer Harbor Activation Project Oct 20

ECHDC Outer Harbor Activation Project

https://encorus.com/app/uploads/2021/10/Evan-Krug-PE-talks-about-the-ECHDC-Outer-Harbor-Activation-project-1.mp4 Lead Mechanical Engineer, Evan Krug, PE discusses Encorus Group’s involvement with the redesign and rehabilitation of Buffalo’s Outer Harbor.... Read more
Process Engineering Services Oct 13

Process Engineering Services

Process engineering is the discipline responsible for designing, implementing and optimizing the processes that turn raw materials into an end product.  Determining the energy, chemicals and equipment needed in facilities, both new and existing, is an essential part... Read more
CUBRC Testing Facility Engineering Support Sep 29

CUBRC Testing Facility Engineering Support

CUBRC is a research, development, and testing company with headquarters in Cheektowaga, NY. The firm wanted to build a new 120 square foot structure, with 20 foot high walls. Due to the nature of the testing performed at the facility, the new building was subject to... Read more